Installation Package, for super-automatic espresso machines, the install, start and adjust program includes limitd installaton, equipment inspection, equipment start-up and operator training by a single person in locations 35 miles or less from a GMCW Authorized Service Center. When installation is purchased with a machine, the unit will be shipped to the installer. The customer must provide the following for installation: 1. Appropriate electric service within 4 feet of the machine's location for electric hook-up including appropriate heavy duty grounded receptacle with its own breaker. 2. Access to cold water with minimum of 30 psi pressure with adequate shut-off valve within 6 feet of the machine's location on units requiring water line hook-up. 3. Adequate drain availability for flexible drain hose on units requiring water line hook-up. 4. Adequate and appropriate space to position unit. *Additional charges (i.e. removal of old equipment, work required to reach compliance with installation requirements above, travel time outside stated radius, or other expenses outside normal installation situation) are the responsibility of the customer. Contact the factory for special Start and Adjust pricing for 2 or more units in the same location.
Manufacturer | Grindmaster |
Model Number | GRI-INSTALLATION-PKG |
Packed By | Each |