Call us Toll Free



Grindmaster INSTALLATION PKG Installation



Grindmaster INSTALLATION PKG Installation
Grindmaster INSTALLATION PKG Installation (Magnified)
Grindmaster INSTALLATION PKG Installation

Sorry, this item is no longer for sale.






Be the first to write a review




Product Information

Installation Package, for super-automatic espresso machines, the install, start and adjust program includes limitd installaton, equipment inspection, equipment start-up and operator training by a single person in locations 35 miles or less from a GMCW Authorized Service Center. When installation is purchased with a machine, the unit will be shipped to the installer. The customer must provide the following for installation: 1. Appropriate electric service within 4 feet of the machine's location for electric hook-up including appropriate heavy duty grounded receptacle with its own breaker. 2. Access to cold water with minimum of 30 psi pressure with adequate shut-off valve within 6 feet of the machine's location on units requiring water line hook-up. 3. Adequate drain availability for flexible drain hose on units requiring water line hook-up. 4. Adequate and appropriate space to position unit. *Additional charges (i.e. removal of old equipment, work required to reach compliance with installation requirements above, travel time outside stated radius, or other expenses outside normal installation situation) are the responsibility of the customer. Contact the factory for special Start and Adjust pricing for 2 or more units in the same location.

Specifications

Manufacturer Grindmaster
Model Number GRI-INSTALLATION-PKG
Packed By Each
Share this result using
     

Reviews

Be the first to write a review!

Login or register to write a review